on nuclear power plants in EPRI NP, “Guidelines for Nuclear Plant Response to an Earthquake,” December This regulatory. These guidelines are in EPRI NP, “A Criterion for Determining Earthquake,” July ; EPRI NP, “Guidelines for Nuclear Plant. EPRI-NP Guidelines for Nuclear Plant Response To an Earthquake.

Author: Nigal Dolkis
Country: Namibia
Language: English (Spanish)
Genre: Automotive
Published (Last): 1 February 2009
Pages: 423
PDF File Size: 1.77 Mb
ePub File Size: 17.8 Mb
ISBN: 386-2-75949-918-1
Downloads: 80951
Price: Free* [*Free Regsitration Required]
Uploader: Groshura

There was a problem providing the content you requested

Here you only see the latest event report ERF send date: Therefore, on August 26, the operator declared all safety-related SSCs of Units 1 and 2 inoperable for technical specifications purposes. None of the aftershocks resulted in any impact to plant structures, systems, or components. Thu, ERF description: Here you only see the latest event report. Due to additional seismic activity, North Anna declared an NOUE on two other occasions with the final one being declared on September 1, The NRC technical evaluation of restart readiness can be viewed at the following links: On August 29, the NRC dispatched an Augmented Inspection Team AIT to the North Anna Power Station to assess the circumstances surrounding the total loss of offsite power and dual unit reactor trip, the emergency diesel generator coolant leak and other plant equipment issues.

  LIBRO NO TE ARRUGUES PDF

Contact us if a location is wrong. Drag or zoom the map to explore different areas. The plant exited the NOUE on the afternoon of August 24 after completing all walkdown inspections of the equipment that is most susceptible to seismic activity.

The map shows eprk maximum of incidents.

Trial application of guidelines for nuclear plant response to..|INIS

Following the earthquake, both North Anna units experienced a complete loss of offsite alternating current AC power LOOP sources to emergency electrical buses due to the actuation of transformer pressure relays from the effects of seismic action. Sometimes there are multiple event reports, updating the rating, the event description. If hundred incidents or more are within the map, the yellow perimeter indicates from where events are excluded.

Amplifying information concerning the NRC actions in response to the August 23, earthquake in Virginia is available in the NRC’s website at the following link: Cook and Palisades in Michigan. All of these plants exited their NOUE declarations after completing inspections and receiving confirmation of normal conditions.

Last update on 01 Dec ERF affiliation: To demonstrate that no functional damage occurred as a result of the earthquake and that it was safe to operate the facility without undue risk to the health and safety of the public, eprri North Anna Power Station operator performed a number of inspections, tests, and analyses under the oversight of the United States Nuclear Regulatory Commission.

  KA3843 DATASHEET PDF

The CAL confirmed the understanding 669 the plant operator was not to enter Modes 1 through 4 until the NRC has completed its safety evaluation and reported its conclusion to the plant operator in writing. A backup, “station blackout” diesel generator was started to assume the loads that were being supplied by the 2H EDG.

On August 23,an earthquake measuring 5. Cynthia Eprii ERF address: Units 1 and 2 entered cold shutdown conditions on August 24, and August 25,respectively. To demonstrate that no functional damage occurred as a result of the earthquake and that it was safe to operate the facility without undue risk to the health and safety of the public, the North Anna 66995 Station operator performed a number of inspections, tests, and analyses, consistent with EPRI NP, “Guidelines for Nuclear Plant Response to an Earthquake.

The inspections found that the equipment was in satisfactory condition.