ANG ETL 01-1-1 PDF

ANG ETL 01-1-1 PDF

responsibility for a UFC, ANGETL, or AF ETL which references a .. Tab D, ANGETL , ANG Design Policy, provides general technical. Ang Etl 01 1 1 Air National Design Guide ✔ epub download Ang Etl 01 1 1 Air National Design Guide department of the air force headquarters united states air . Guard. 2. [PDF] Ang ETL 01 1 1 – Sun, 02 Dec GMT. BY ORDER OF THE CHIEF, ANGI NATIONAL GUARD.

Author: Tamuro Kigataur
Country: Andorra
Language: English (Spanish)
Genre: Career
Published (Last): 14 June 2018
Pages: 153
PDF File Size: 18.1 Mb
ePub File Size: 19.5 Mb
ISBN: 934-5-19547-320-6
Downloads: 44871
Price: Free* [*Free Regsitration Required]
Uploader: Zolojinn

It requires us to apply the complex testing validation rule during the test.

Challenge We also faced some challenges going forward since most of the steps performed are semi-automated execution. Total interior and exterior renovation — new roof lines, geothermal HVAC, updated flooring, kitchen and bathroom cabinets, appliances, painting, electrical, landscaping, concrete porches, sidewalks, parking lot.

We also faced a number of challenges during the testing as this is a new field for the traditional DBMS testing. Learn how your comment data is processed.

During the test execution, the main objective is to ensure that all rows in MySQL are properly transformed, aggregated and loaded to MongoDB. Milan, TN — Geothermal Installation: Leave a Reply Cancel reply. Installation to meet NEC requirements.

This project was in a historically significant, year-old building, so it was imperative to maintain the historic look and accuracy of the building. Provide and install electric meters. Total number counting validation by some fields. Removal of three folding day gates, a solid double door.

  IL FRONIMO PDF

The Ohio Independent Baptist, September 1953

Zinc-plated rivets to prevent corrosion. Complete with smooth rolling wheels and padlock lug. Gates shall fold completely and swing a full degrees for an unobstructed clear opening. We also faced some challenges going forward since most of the steps performed are semi-automated execution. Readout should include Total Harmonic Qng. This site uses Akismet to reduce spam. Automotive Communications Consumer Markets.

The Ohio Independent Baptist, September

If there are videos or images in the source system and they can be loaded to MongoDB as wtl, this is another challenge to test it. Local read out at the meter. Field by field check. From the testing perspective, we did data comparison on both sides to ensure the total numbers and data were properly loaded to MongoDB.

Performing a Functional Test for ETL from MySQL to MongoDB

Data at the central head end needs to be programmed to be able to record each piece of data hourly, daily, monthly, yearly, at intervals of 15 minutes. Installation of three new folding day gates, one pass through security day gate, a solid metal double door with panic hardware and personnel notification system.

Install utility monitoring devices to all listed buildings. For example, if there is a sales table in MySQL, we can count the total rows group by region to learn the sales total count for each region. Aggregation rule validation during ETL. There are several testing points where we should apply the specific comparison and validation on. In the meantime, in MongoDB we could apply the following query syntax to get the same effect. Data needs to be stored at the local level if communication to central is interrupted for 45 days.

  JOSE VASCONCELOS RAZA COSMICA PDF

Energy Financial Services Healthcare. Gate shall have baked architectural brown finish for a longer life. Double gates shall have a cane bolt that holds left half in position, or both halves may be opened for full access. With the mapping lineage from source to target, we can test the ETL correctness field by field and compare the row numbers. High Tech Life Sciences Manufacturing. Meters need to monitor and send the following data: This is a complex case, but the idea is similar to what we did in the traditional DBMS aggregation.

To test it, we could introduce a staging table in MongoDB to reflect the source data.

Write software to integrate meters into DDC system. Tie meters into DDC controls.